What information can be updated in the Master PM application for an associated Preventive Maintenance record (PM)?
Correct Answer:
A
🗳️
When creating a new Inspection form, a client requires a Work Order to be created if certain responses are recorded. Which two actions are required for this to be achieved? (Choose two.)
Correct Answer:
CD
🗳️
In which three applications can Asset Depreciation be configured? (Choose three.)
Correct Answer:
CEF
🗳️
How is the Lock Out / Tag Outs application structured?
Correct Answer:
C
🗳️