Refer to the exhibits.
Exhibit 1. Existing wiring plan:
Exhibit 2. Current proposal:
A customer has a building that needs a switch upgrade. The customer would like at least 20Gbps for the uplink bandwidth out of each closet. The building writing plan is shown in Exhibit 1. The customer will not consider any cable upgrades at this point. The current proposal is shown in Exhibit 2.
Which correction must architect make to the proposal to meet the customer requirements?
Correct Answer:
D
🗳️
What is one customer requirement that can drive the need for a relatively dense AP deployment, in which the coverage areas of at least three AP radios overlap?
Correct Answer:
D
🗳️
Refer to the exhibit.
An architect has planned the wireless and wired access layers for a network upgrade. The entire solution must support 9,000 wireless devices and 2,250 wired endpoints.
The campus core must meet these requirements:
✑ no more than 4:1 oversubscription on the links to the data center
✑ switch-level redundancy
✑ near instant failover if one core switch fails
✑ link aggregations between access layer and core
✑ same switch software used across the entire campus
Which exhibit shows a campus core that meets the customer needs?
A.
B.
C.
D.
Correct Answer:
B
A customer has an existing Aruba network, which currently supports up to 9,000 wireless client devices. The existing network includes these components:
✑ Four 7210 MCs
✑ Five 7030 MCs
✑ 200 AP-303HRs
✑ 300 AP-345s
The customer wants to convert to an ArubaOS 8.x architecture. The architect plans to deploy a virtual MM.
Which exhibit shows the correct BOM for the MM?
A.
B.
C.
D.
Correct Answer:
C