An architect is designing a new vSphere solution. The following information has been gathered during the design workshops with the customer:
The solution will be deployed into two availability zones (AZs)
The solution will be configured as a single stretched cluster with shared storage across the two AZs
Production and Development workloads will run across both AZs
The cluster is configured as N + 1
The architect needs to ensure that, in the event of a host failure during maintenance of another host in the cluster, only the Production workloads are recovered.
What should the architect include in the design to meet this requirement?
wildcatwonder2025
5 days, 4 hours ago