exam questions

Exam 3V0-21.23 All Questions

View all questions & answers for the 3V0-21.23 exam

Exam 3V0-21.23 topic 1 question 57 discussion

Actual exam question from VMware's 3V0-21.23
Question #: 57
Topic #: 1
[All 3V0-21.23 Questions]

An architect is responsible for the lifecycle management design for a brownfield vSphere-based solution.
The following information has been provided during initial meetings around the new solution:
Existing heterogeneous server hardware will be used to provide the hosting platform.
The available hardware is:
10 servers that contain 2 x 20-Core Intel Xeon processors and 512 GB RAM from Vendor A
10 servers that contain 2 x 24-Core Intel Xeon processors and 768 GB RAM from Vendor A
20 servers that contain 2 x 16-Core AMD EPYC processors and 512 GB RAM from Vendor B
10 servers that contain 1 x 24-Core AMD EPYC processors and 256 GB RAM from Vendor C
All of the hardware is currently listed on the VMware Hardware Compatibility List (HCL).
All existing server hardware has 36 months vendor support remaining.
The requirements from the customer are:
REQ001 - The solution must support the hosting of 5,000 workloads across two physical sites.
REQ002 - The solution should minimize the number of clusters.
REQ003 - The solution must ensure that there is no impact to service when completing upgrades.
Given the resource requirements needed for the solution, the architect has calculated that all of the existing servers will be required to provide sufficient resources for the new environment. The Intel-based servers will be deployed to the primary site and the AMD-based servers will be deployed to the secondary site.
Which four additional design decisions should the architect make to ensure all requirements can be met? (Choose four.)

  • A. The solution will create an Intel-based 20-node vSphere cluster in the primary site and an AMD-based 30-node vSphere cluster in the secondary site.
  • B. The solution will use VMware SDDC Manager to perform lifecycle management of the solution.
  • C. The solution will ensure each vSphere cluster supports a minimum of N + 1 redundancy.
  • D. The solution will use vSphere Lifecycle Manager images to update and upgrade vSphere ESXi hosts in the secondary site.
  • E. The solution will use vSphere Lifecycle Manager baselines to perform patching and upgrading of vSphere ESXi hosts in the secondary site.
  • F. The solution will use vSphere Lifecycle Manager images to update and upgrade vSphere ESXi hosts in the primary site.
  • G. The solution will ensure each vSphere cluster is configured with Distributed Power Management (DPM).
Show Suggested Answer Hide Answer
Suggested Answer: BCDF 🗳️

Comments

Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.
Switch to a voting comment New
wildcatwonder2025
5 days, 4 hours ago
Selected Answer: ACDE
I think the patching is mentioned with LCM at each site, but A should i think be selected to define the clusters.
upvoted 1 times
...
Community vote distribution
A (35%)
C (25%)
B (20%)
Other
Most Voted
A voting comment increases the vote count for the chosen answer by one.

Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.

SaveCancel
Loading ...
exam
Someone Bought Contributor Access for:
SY0-701
London, 1 minute ago