An administrator needs to configure a content library solution based on the following infor-mation:
• A new corporate virtual machine (VM) template is created every month to include all of the latest patches.
• The new VM template should be downloaded from the primary data center site (London) to two secondary data center sites (Tokyo and New York) as soon as possible.
• There is limited disk space available at one of the secondary data center sites (Tokyo) due to an ongoing data center consolidation project.
Which four steps should the administrator take to configure the content library solution before adding a VM template? (Choose four.)