Steven is a Scrum Master on a new Scrum Team.
What would be the best way for him to determine if the Product Owner is interacting enough with the Development Team during a Sprint?

  • A. Check whether the Product Owner is actively engaged at the Daily Scrums.
  • B. Check whether the Increment presented at the Sprint Review meets the Product Owner's expectations.
  • C. See whether the Product Owner has provided enough information at the Sprint Planning to make his/her presence optional during the Sprint. The level of autonomy within Development Team can be the result of having the right presence from the Product Owner.
  • D. The Product Owner must always be present with the Development Team. Unavailability of the Product Owner is prohibited in Scrum.
Show Suggested Answer Hide Answer
Suggested Answer: B 🗳️

Comments

Chosen Answer:
This is a voting comment (?) , you can switch to a simple comment.
Switch to a voting comment New
Mbouzidi
4 months ago
Selected Answer: B
B because that prove the interaction. C is not correct, it's talk about no interaction during the sprint
upvoted 1 times
...
OMG4567
4 months ago
Selected Answer: B
B is correct since the approval of PO in the SR is needed. If that is achieved there was enough communication.
upvoted 1 times
...
Luke_1301
8 months, 1 week ago
Selected Answer: B
By inspecting the quality of the Increment, the Scrum Master can measure the level of interaction between the PO and Developer
upvoted 1 times
...
eacunha
11 months ago
Selected Answer: B
B. Verifique se o Incremento apresentado na Sprint Review atende às expectativas do Product Owner. Ao verificar se o Incremento atende às expectativas do Product Owner durante a Sprint Review, Steven pode determinar se o Product Owner está interagindo o suficiente com a equipe durante o Sprint. Isso permite avaliar se a colaboração e a comunicação entre o Product Owner e a Equipe de Desenvolvimento estão ocorrendo de maneira eficaz.
upvoted 3 times
...
Gataparda
11 months, 2 weeks ago
C is not correct. B is correct. PO presence in Sprint Planing ist important.
upvoted 2 times
...
amog
3 years, 8 months ago
C is correct
upvoted 1 times
...
Community vote distribution
A (35%)
C (25%)
B (20%)
Other
Most Voted
A voting comment increases the vote count for the chosen answer by one.

Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.

SaveCancel
Loading ...