You are preparing to install a new 2-node AFF A250 system at a customer site with an existing cluster that uses NetApp CN1610 cluster interconnect switches. In this scenario, what are two valid actions for this installation? (Choose two.)
A.
Add the new nodes to the existing cluster and switches.
B.
Create a new 2-node switched cluster that uses the CN1610 cluster switches.
C.
Create a new 2-node switchless cluster.
D.
Migrate the existing cluster to new switches and add the new nodes.
Should be C and D , must not B
Because AFF A250 not supported with CN1610 switches
Reference:
https://kb.netapp.com/Advice_and_Troubleshooting/Flash_Storage/AFF_Series/Controller_Hardware_Upgrade%3A_Adding_AFF_A250_nodes_to_existing_cluster_report_HA_interconnect_errors_and_cannot_perform_takeover
upvoted 4 times
...
Log in to ExamTopics
Sign in:
Community vote distribution
A (35%)
C (25%)
B (20%)
Other
Most Voted
A voting comment increases the vote count for the chosen answer by one.
Upvoting a comment with a selected answer will also increase the vote count towards that answer by one.
So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.
ec9ab55
12 months agoPanRi
1 year, 1 month agoscanossa
1 year, 4 months agoDaisyMuscula
1 year, 6 months agoHangLiu
1 year, 9 months ago