All switches shown are CX 6300M. The links connecting SW3 to both SW1 and SW2 are broken. Multi-Active Detection has not been enabled. What are two results? (Choose two.)
A.
The stack wall split resulting in SW1 remaining an active VSF Master and SW3 disabling all ports. SW2 will automatically take the VSF Standby role.
B.
A re-election will occur upon repairing the disabled links between SW2 and SW3. The switch with the highest priority will reclaim the Master role with the lowest bridge mac-address acting the tie-breaker.
C.
The OSPF adjacency between the OSPF neighbor and the VSF stack switches (SW2 and SW3) will remain up. Packets destined for SW3 that are received on SW2 are discarded.
D.
The stack will split with SW1 remaining an active VSF Master and SW3 becoming another active VSF Master. Switch 2 will remain a VSF member switch.
E.
Only the OSPF adjacency between SW3 and the OSPF neighbor will fail. All routed traffic will be redirected to SW2 instead.
This section is not available anymore. Please use the main Exam Page.HPE6-A72 Exam Questions
Log in to ExamTopics
Sign in:
Community vote distribution
A (35%)
C (25%)
B (20%)
Other
Most Voted
A voting comment increases the vote count for the chosen answer by one.
Upvoting a comment with a selected answer will also increase the vote count towards that answer by one.
So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.
Grantho_53
6 months ago