Your customer needs a compute solution. Their aging data center can only supply 5kW per rack, which is below the 15kW required for your planned solution.
Which change could you recommend to satisfy the requirement while maintaining the planned solution’s level of performance? (Choose two.)

  • A. Design the solution with non-redundant power supplies.
  • B. Use BMC tools to cap the power consumption of each server at 33%.
  • C. Spread the infrastructure across additional racks.
  • D. Host the compute solution with a colocation provider.
  • E. Convert the solution to HPE GreenLake pay-per-use.
Show Suggested Answer Hide Answer
Suggested Answer: CD 🗳️

Comments

Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.
Switch to a voting comment New
7db91d3
7 months ago
Selected Answer: DE
The course suggests considering all solutions with GreenLake's pay-per-use model.
upvoted 1 times
...
eddb
9 months, 1 week ago
Selected Answer: CD
C. Spread the infrastructure across additional racks. Distributing the servers across more racks ensures each rack stays within the 5kW power limit. D. Host the compute solution with a colocation provider. A colocation provider can offer facilities with higher power capacity per rack, meeting your 15kW requirement and maintaining performance. Using BMC tools to cap the power consumption of each server at 33% is not recommended as it would likely degrade performance.
upvoted 2 times
...
eddb
9 months, 2 weeks ago
Selected Answer: BD
Spread the infrastructure across additional racks: This would increase the physical footprint and possibly require changes to the data center layout, which may not be feasible or cost-effective.
upvoted 2 times
...
Community vote distribution
A (35%)
C (25%)
B (20%)
Other
Most Voted
A voting comment increases the vote count for the chosen answer by one.

Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.

SaveCancel
Loading ...
exam
Someone Bought Contributor Access for:
SY0-701
London, 1 minute ago