exam questions

Exam NSE5_FMG-7.2 All Questions

View all questions & answers for the NSE5_FMG-7.2 exam

Exam NSE5_FMG-7.2 topic 1 question 7 discussion

Actual exam question from Fortinet's NSE5_FMG-7.2
Question #: 7
Topic #: 1
[All NSE5_FMG-7.2 Questions]

Refer to the exhibit -

Which two statements about the output are true? (Choose two.)

  • A. Configuration changes have been installed on FortiGate, which means the FortiGate configuration has been changed.
  • B. The latest revision history for the managed FortiGate does match the FortiGate running configuration.
  • C. Configuration changes directly made on FortiGate have been automatically updated to the device-level database.
  • D. The latest revision history for the managed FortiGate does not match the device-level database.
Show Suggested Answer Hide Answer
Suggested Answer: BD 🗳️

Comments

Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.
Switch to a voting comment New
DatBroNZ
3 months, 3 weeks ago
Correct answers are B & D: FortiManager 7.2 Study Guide page 160 "conf: in sync" means FortiGate configuration is in sync with the latest running revision history. "db: modified" and "cond: pending" means that changes have been made to the device-level settings and need to be installed.
upvoted 1 times
...
DaniSerb
3 months, 3 weeks ago
Selected Answer: BD
The example on this slide shows that the FortiGate configuration is in sync with the latest running revision history. However, changes have been made to the device-level settings. That is why the CLI output is showing db:modified and the cond is showing as pending. After you install the changes on FortiGate, it will show db: not modified and cond:OK. db:modified = Config changes made on FMG cond:in sync = Latest revision history in sync with FGT running-config cond:pending = Config changes needed to be installed Reference [Page 160] - https://ebin.pub/fortinet-fortimanager-study-guide-for-fortimanager-72.html
upvoted 3 times
...
Satekhi
12 months ago
Selected Answer: BD
B. The output indicates "STATUS: dev-0: modified," suggesting that there have been modifications to the FortiGate configuration. This implies that the latest revision history for the managed FortiGate does match the FortiGate running configuration. D. The output includes information about the status and synchronization, and it mentions "cont: 0 sync: second: pending: dr: received: com:." This suggests that there might be differences or pending changes between the FortiGate and the device-level database, indicating that the latest revision history for the managed FortiGate does not match the device-level database.
upvoted 4 times
...
GeniusA
12 months ago
The answer are BD
upvoted 1 times
...
Community vote distribution
A (35%)
C (25%)
B (20%)
Other
Most Voted
A voting comment increases the vote count for the chosen answer by one.

Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.

SaveCancel
Loading ...
exam
Someone Bought Contributor Access for:
SY0-701
London, 1 minute ago