A company is using SRDF/AR Multi-Hop as a disaster recovery solution. Their primary application requires 27.3 TB on their primary site. How much storage capacity is required on the third site?
Answer must be A: Third site has a single connection for changed tracks only, the capacity can't be greater than 27.3TB.
upvoted 2 times
...