DRAG DROP
-

What is the correct sequence of steps to deploy a second VDS for VxRail network traffic?

Show Suggested Answer Hide Answer
Suggested Answer:

Comments

Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.
Switch to a voting comment New
jnsawcsmlezaveixwl
1 year, 7 months ago
100% correct High-level steps: 1. Cable VxRail NIC ports to ToR switches. 2. Configure ToR switches to support VxRail network traffic on switch ports that are connected to the VxRail NIC ports. 3. Create a VDS with the required number of uplinks. 4. Create port groups for the VxRail networks that must be migrated to the new VDS.
upvoted 1 times
...
jnsawcsmlezaveixwl
1 year, 7 months ago
High-level steps: 1. Cable VxRail NIC ports to ToR switches. 2. Configure ToR switches to support VxRail network traffic on switch ports that are connected to the VxRail NIC ports. 3. Create a VDS with the required number of uplinks. 4. Create port groups for the VxRail networks that must be migrated to the new VDS.
upvoted 1 times
...
Community vote distribution
A (35%)
C (25%)
B (20%)
Other
Most Voted
A voting comment increases the vote count for the chosen answer by one.

Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.

SaveCancel
Loading ...
exam
Someone Bought Contributor Access for:
SY0-701
London, 1 minute ago