Scenario: A Citrix Architect has implemented two high availability pairs of MPX 5500 and MPX 11500 devices respectively with 12.0.53.13 nc version. The NetScaler devices are set up to handle NetScaler Gateway, Load Balancing, Application Firewall, and Content Switching. The Workspacelab infrastructure is set up to be monitored with NMAS version 12.0.53.13 nc by the Workspacelab administrators. The Workspacelab team wants to implement one more pair of NetScaler MPX 7500 devices with version 12.0.53.13 nc.
The Citrix consulting team has assigned the task to implement these NetScaler devices in the infrastructure and set them up to be monitored and managed by NMAS.
The following are the requirements that were discussed during the project initiation call:
NMAS should be configured to get the infrastructure information under sections such as HDX Insight, WEB Insight, and Security Insight.
Configuration on the new MPX devices should be identical to MPX 11500 devices.
Configuration changes after the deployment and initial setup should be optimized using NMAS.
NMAS should be utilized to configure templates that can be utilized by the Workspacelab team in future deployment.
As per the requirement from the Workspacelab team, NMAS should be store the audited data for only 15 days.
Which process should the architect utilize to ensure that the deployment of MPX 11500 devices are optimized and that it is correct, before deploying the devices in production?