An engineer must design AP placements for a new branch office that contains two floors. The engineer uses Ekahau to complete the predictive survey. To calculate the signal bleed through between floors, the engineer creates a building, adds the floors, and attenuations areas. After the scale is set, what else must be added on the floors to accurately measure the signal bleed at a specific location?

  • A. Choose the access point models.
  • B. Start the auto planner.
  • C. Add alignment points.
  • D. Draw in coverage areas.
Show Suggested Answer Hide Answer
Suggested Answer: C 🗳️

Comments

Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.
Switch to a voting comment New
grivanoj
3 weeks, 3 days ago
Selected Answer: C
Adding alignment points on each floor helps to accurately measure the signal bleed through between floors. These points ensure that the software understands the vertical alignment between the floors and can properly calculate the signal propagation.
upvoted 1 times
...
Community vote distribution
A (35%)
C (25%)
B (20%)
Other
Most Voted
A voting comment increases the vote count for the chosen answer by one.

Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.

SaveCancel
Loading ...
exam
Someone Bought Contributor Access for:
SY0-701
London, 1 minute ago