SIMULATION
-
Guidelines
-
This is a lab item in which tasks will be performed on virtual devices.
• Refer to the Tasks tab to view the tasks for this lab item.
• Refer to the Topology tab to access the device console(s) and perform the tasks.
• Console access is available for all required devices by clicking the device icon or using the tab(s) above the console window.
• All necessary preconfigurations have been applied.
• Do not change the enable password or hostname for any device.
• Save your configurations to NVRAM before moving to the next item.
• Click Next at the bottom of the screen to submit this lab and move to the next question.
• When Next is clicked, the lab doses and cannot be reopened.
Topology
-
Tasks
-
R1 and R2 are pre-configured with all the necessary commands. All physical cabling is in place and verified. Connectivity for PC1 and PC2 must be established to the switches; each port must only allow one VLAN and be operational.
1. Configure SW-1 with VLAN 15 and label it exactly as OPS
2. Configure SW-2 with VLAN 66 and label it exactly as ENGINEERING
3. Configure the switch port connecting to PC1
4. Configure the switch port connecting to PC2
5. Configure the E0/2 connections on SW-1 and SW-2 for neighbor discovery using the vendor-neutral standard protocol and ensure that E0/0 on both switches uses the Cisco proprietary protocol
Shaifalimittal02
3 months, 2 weeks agotollovia
3 days, 20 hours ago6353e2d
4 months, 1 week agoexiledwl
3 months, 3 weeks agobymrdas
7 months, 4 weeks agobymrdas
6 months, 2 weeks ago[Removed]
8 months agoexiledwl
3 months, 2 weeks ago86a50a6
9 months, 3 weeks agoKuyaErik101
9 months, 3 weeks ago[Removed]
1 year, 1 month agoAbdullahMohammad251
1 year agoJunsK1e
1 year, 1 month ago