From CCDA 200-310 Official Cert Guide (page 16):
Network implementation plan (NIP): Contains the steps required to install and configure
the network equipment and the steps that verify basic network operation. Information
for each step should include step description, estimated implementation time, and design
document references.
upvoted 1 times
...