The diagram below shows the process of manufacturing of item D and the capacity of each operation. Each operation requires one unit from the previous step.
Which of the following is the total production throughput?
The correct answer is A because it is the bottleneck in the system and the entire system is only as good as its weakest link. Also, the last sentence says each step needs the item from the previous step.